top of page


Why Rig Capacity Matters on Larger Horizontal Directional Drilling Projects
Choosing the right HDD rig is about more than machine size. Thrust, pullback, torque, bore length, product diameter and ground conditions all influence whether a rig has the capacity to complete a project safely and efficiently. This article looks at why matching rig capability to project requirements matters.
Kathryn Coetzer
Sep 105 min read
Â
Â
Â


8 Situations Where Horizontal Directional Drilling Could Be the Better Option
Horizontal Directional Drilling isn’t always the right solution, but in the right conditions, it can reduce disruption, protect existing infrastructure and make difficult crossings far more manageable. Here are eight situations where HDD could be the better option for your project.
Kathryn Coetzer
Sep 14 min read
Â
Â
Â


What Information Do You Need Before Requesting a Directional Drilling Quote?
Planning a directional drilling project? An accurate quote depends on more than distance. Pipe size, pipe type, site access, entry and exit points, wayleaves, existing underground services, ground conditions and timing can all affect the method, equipment, risk and cost. In this article, we explain what information to prepare before requesting a directional drilling quote.
Kathryn Coetzer
Jul 75 min read
Â
Â
Â


Horizontal Directional Drilling vs Open Trenching: Which is Right for Your Project?
Compare Horizontal Directional Drilling (HDD) with traditional open trenching and explore which method may be better suited to your project. We look at disruption, access, ground conditions, reinstatement, cost and other practical factors that can influence the right installation method.
dane25
Oct 18, 20236 min read
Â
Â
Â
bottom of page
