top of page
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Horizontal Directional Drilling - Kriel Ash Dam Drainage Project
The objective was to drill 50m into the side of the ash dam wall to install 110mm perforated HDPE pipe that are covered in a Bidim sock.
We had to do this project throughout the ash dam on each one of the levels. The process to get the Bidim cover pipe into the side of an ash dam wall was a breakthrough for us.




bottom of page