Horizontal Directional Drilling - King Cetshwayo Bridge KZN

We were required to drill and install a 160mm sleeve for the installation of power cables underneath the King Cetshwayo Bridge in KwaZulu Natal.

It was Kayeworx responsibility to do the GPR Scanning, Supply and welding of the HDPE pipe as well as to drill and install the 160mm sleeve.